Today’s picture of the day from the jobsite is of the framing for the exterior wall at the Mars Hill project. We can do this because the helical piers are in.

When you putting an addition onto a hillside home, you must ensure your foundation and footings are secure. This job required the use of helical piers to support the weight and span of the addition and the new deck and covered porch area. When installing these piers you must drill down into bedrock. Luckily we are in a pretty rocky area, so it wasn’t long before we reach the distance we needed.